Cambridge Science Park

FULL STRIP OUT | DEMOLITION

Services – Full Office Strip with Internal Demolition

Client – Cambridge Science Park

Location – 270 Cambridge Science Park

Site Manager – Alan Ratibb

Duration – 8 Weeks

Sq. Ft – 4500m2

The building previously belonged to Toshiba as their offices in East Anglia and we were required to complete a full back to shell strip out consisting of removing all floor finishes and false floors, ceilings, services and all fixtures and fittings.

Included in our package was the demolition of 500lm of concrete walls, the removal of 200m2 of 100mm screed floor and Created 8 openings through  concrete Core walls. During these works we utilised Robotic Demolition by the way of Brokks, Wall and Floor saws for the openings.

The project generated 145 Ton of waste that was disposed of with one of many waste skip providers seeing 98% for the waste fully recycled.