Cambridge Science Park
FULL STRIP OUT | DEMOLITION
Services – Full Office Strip with Internal Demolition
Client – Cambridge Science Park
Location – 270 Cambridge Science Park
Site Manager – Alan Ratibb
Duration – 8 Weeks
Sq. Ft – 4500m2
The building previously belonged to Toshiba as their offices in East Anglia and we were required to complete a full back to shell strip out consisting of removing all floor finishes and false floors, ceilings, services and all fixtures and fittings.
Included in our package was the demolition of 500lm of concrete walls, the removal of 200m2 of 100mm screed floor and Created 8 openings through concrete Core walls. During these works we utilised Robotic Demolition by the way of Brokks, Wall and Floor saws for the openings.
The project generated 145 Ton of waste that was disposed of with one of many waste skip providers seeing 98% for the waste fully recycled.